PLANT EVALUATION

Copyright 1997

From : Clarence Richard...800-372-7731 FAX 612 938 3304
3908 Tonkawood Rd, Minnetonka, MN 55345

Fill out the evaluation online or print the form to mail in.

Fill in what you can now. We'll call back to discuss the rest.

 

Check boxes to all yes answers below
Company Name
Phone
Contact
Plant Location
Elevation above Sea Level
Manager Name
Phone
Operator Name
Plant...Brand
Model
Serial Number
Year
Annual Production typical in tons/year.
How long does Company plan on keeping plant? Yrs.
Does Company plan to invest in it to keep up resale value?
Plant Type Batch

Drum mix

Batch Plant Wet / Dry mix times Wet: Dry:
Manufacturer’s Plant Rating at 5% moisture, with 300 degree virgin mix at 70 degree ambient temp at 536 feet elevation Tons/Hr
Actual Plant Maximum Rate TPH at Moisture, with degree virgin mix at degree ambient temp. Fuel consumption (in thousands of BTUs) or gallons/cubic feet per ton. Dryer Exit gas temp = . Mix product name: . Recycle is percent of total mix
Combustion..Burner Draft
Baghouse Pressure Drop
Exhaust Fan SP
Exhaust Fan Amps
Blower Amps
Blower Air Pressure
Damper Position % open
Fuel Type
Burner Model#
Fuel Pressure psi
Diameter Drum
If baghouse, choose dust return type pneumatic or auger
Baghouse Inlet Temperature degrees
Baghouse Outlet Temperature degrees
# of Bags
Length of bags (in inches or feet)
Diameter of bags (in inches)
If Scrubber, describe
All burner safety and plant shutdown interlocks checked regularly?
Are your trucks waiting on the plant excessively?
How much has lightning damage cost you over the past five years?
Do you store emulsified asphalt oils on site?
Do you experience segregation, improper oil percentage or gradation problems, etc.?
Have you had disasters that causes have not been identified and/or corrected?
How much down time did you have? Last year

Pervious year

What items seem to need repair or replacement more often than necessary?
How much waste material does your plant every day, average? tons.

Most in one day?

How many times have you over filled your asphalt tank?
How many times has dry aggregate contaminated good mix in the silo?
How many stops per 10 hour day does your plant average?
Do you know how to properly lockout/tagout all of your equipment?

Please print this form for your records before submitting.

Thank You.