Elimination of Baghouse Fines Feed Surges and Sags while Adding Mineral Filler while Rejecting Some Dust
|
Three TPH Average Aggregate Dust is being drawn from 100 TPH of Total Asphalt Mix produced. Mix design calls for 7% Mineral Filler. Baghouse delivery from the air lock typically sags and surges 2% to 4% slowly over several minutes. Mineral Filler Storage Silo Discharge Valve automatically opens when Dust Surge Bin level reaches 33% and stops or opens when the bin reaches 100%. Notice what happens between 2:00, 2:01, and 2:02.
|
2:00
2:01
2:02
Back to Dust Links
|
All text and images on this site copyright ©2005 by Clarence Richard, unless otherwise noted.
Page design based on layouts from CobraRose Creations.
|